Supermarket refrigeration rack with parallel compressors and headers

Portfolio

Proven results across industries.

HVAC installations, plumbing systems, refrigeration builds, building automation integrations and long-term maintenance programs — each tailored to the demands of the industry it serves.

Range

From hospitals and assisted living facilities to resorts, grocery stores and manufacturing plants

Hospital central plant

Healthcare

Hospital central plant

Chilled water plant maintenance and inspection on a continuously occupied acute-care site.

HVAC

PMA

MRI chiller support

Healthcare

MRI chiller support

Specialized chiller service for imaging suites where temperature stability is a clinical requirement.

HVAC

Senior living systems upgrade

Assisted Living

Senior living systems upgrade

Medical gas infrastructure, backflow prevention and domestic hot water for a residential care community.

Plumbing

HVAC

Resort chilled water plant

Hospitality

Resort chilled water plant

Large-scale chilled water and building automation work planned around occupancy peaks.

HVAC

BAS

Commercial kitchen package

Restaurants

Commercial kitchen package

Kitchen refrigeration, grease trap service and hot water systems for a high-volume kitchen.

Refrigeration

Plumbing

Rack system and display cases

Grocery & Retail

Rack system and display cases

Refrigeration rack systems, walk-ins and display cases maintained to protect perishable inventory.

Refrigeration

PMA

Campus controls integration

Education

Campus controls integration

Campus-wide monitoring and control across classrooms, labs and auditoria on an open protocol platform.

BAS

HVAC

Process cooling and plant services

Manufacturing & Aviation

Process cooling and plant services

Heavy-duty cooling and industrial plumbing built for continuous production environments.

HVAC

Plumbing

24/7 store refrigeration

Convenience Stores

24/7 store refrigeration

Beverage and food cooler service with overnight attendance so trading hours are unaffected.

Refrigeration

Method

How we approach a project

The entries above differ in scale and discipline. The sequence behind them does not.

01

Understand the facility

Equipment list, operating hours, compliance regime and the constraints nobody mentions until week two.

02

Plan the work

Scope, schedule and shutdown windows agreed in writing before mobilization.

03

Deliver with one contact

HVAC, plumbing, refrigeration and controls coordinated by a single team rather than three trades pointing at each other.

04

Stay on afterward

Most of this work continues as a maintenance agreement once the install is closed out.

Rooftop cooling towers and large-diameter chilled water piping at a resort property
Resort chilled water plant — towers and headers

Scope index

A sample of scopes, by system

Read as a list of systems rather than a list of buildings. The facility types vary; the equipment repeats.

CHW

Hospital central plant

Chiller replacement and chilled water distribution, phased to keep the plant in service.

PRC

Imaging suite process cooling

Dedicated chiller and redundancy for MRI, with start-up documentation.

REF

Grocery refrigeration rack

Parallel compressor rack and case work, cut over outside trading hours.

BAS

Campus controls integration

Open-protocol graphics and trend data across multiple buildings.

DWS

Senior living domestic water

Water heaters, backflow protection and copper mains in an occupied building.

MUA

Commercial kitchen ventilation

Hood, make-up air and exhaust balanced for continuous service.

Looking for work like yours?

Tell us the facility type and the systems involved, and we will talk you through comparable work and how we would approach yours.